The financial subsidy policy for LED lighting industry in Yangzhou will end in July 2011. One stone provoked a thousand layers of waves and caused a chain reaction. Local governments that have also introduced similar subsidy policies are also observing whether they need to follow up. On March 4, an insider of the Yangzhou City Finance Bureau disclosed to the correspondent that subsidies for MOCVD equipment did not continue indefinitely, but the time to stop was still being discussed.
Afterwards, we read through the implementation details of the MOCVD subsidy issued by the Yangzhou City Government in August 2009. It was found in the appendix of the document that "the present Measures shall be implemented as of the date of promulgation and the validity period is tentatively set at two years." The deadline for July 2011 was already within the plan. According to the amount of the first phase of the 2.5 billion yuan subsidy fund of the Yangzhou Municipal Government and the average MOCVD subsidy of 10 million yuan, the number of MOCVD units corresponding to the fund is about 250, and as of March 2011, the Yangzhou government’s external The number of publicly signed MOCVD investment agreements was 198, and there were 52 targets from the target.
Zhang Liansheng, deputy director of the Administrative Committee of Yangzhou Economic and Technological Development Zone, once revealed to the media that as long as the registration is completed before the deadline, even after the equipment purchase plan is in place, policy preferences can still be enjoyed.
Obviously, some of the comments made by relevant persons of the Yangzhou government earlier revealed some "meaning beyond words." One industry official also pointed out the mystery: "Under the investment thinking, the angle of local government's consideration of the problem is certainly not the same. The attitude expressed by individual governments means that there may be a wave of new layout booms in the first half of this year. "The key to the round of investment in government public lighting such as domestic street lamps in the first half of 2009 was officially due to the following factors.
On September 20, 2009, the National Development and Reform Commission jointly issued a Notice on the Development of Semiconductor Lighting Energy-saving Industry Development Opinions (hereinafter referred to as “Opinionsâ€) jointly with five ministries, including the Ministry of Science and Technology, the Ministry of Industry and Information Technology, and the Ministry of Finance. The notice pointed out some major issues to be solved for the current domestic semiconductor lighting (LED) industry development status, including domestic LED epitaxial materials and chips mainly in the middle and low; 80% of power LED chips and devices rely on imports; there are blind With the phenomenon of investment and low-level construction, some local governments have blindly reconstructed road lighting regardless of economic efficiency, excessively investing in landscape lighting, leading to unregulated industry competition, and so on.
Afterwards, we read through the implementation details of the MOCVD subsidy issued by the Yangzhou City Government in August 2009. It was found in the appendix of the document that "the present Measures shall be implemented as of the date of promulgation and the validity period is tentatively set at two years." The deadline for July 2011 was already within the plan. According to the amount of the first phase of the 2.5 billion yuan subsidy fund of the Yangzhou Municipal Government and the average MOCVD subsidy of 10 million yuan, the number of MOCVD units corresponding to the fund is about 250, and as of March 2011, the Yangzhou government’s external The number of publicly signed MOCVD investment agreements was 198, and there were 52 targets from the target.
Zhang Liansheng, deputy director of the Administrative Committee of Yangzhou Economic and Technological Development Zone, once revealed to the media that as long as the registration is completed before the deadline, even after the equipment purchase plan is in place, policy preferences can still be enjoyed.
Obviously, some of the comments made by relevant persons of the Yangzhou government earlier revealed some "meaning beyond words." One industry official also pointed out the mystery: "Under the investment thinking, the angle of local government's consideration of the problem is certainly not the same. The attitude expressed by individual governments means that there may be a wave of new layout booms in the first half of this year. "The key to the round of investment in government public lighting such as domestic street lamps in the first half of 2009 was officially due to the following factors.
On September 20, 2009, the National Development and Reform Commission jointly issued a Notice on the Development of Semiconductor Lighting Energy-saving Industry Development Opinions (hereinafter referred to as “Opinionsâ€) jointly with five ministries, including the Ministry of Science and Technology, the Ministry of Industry and Information Technology, and the Ministry of Finance. The notice pointed out some major issues to be solved for the current domestic semiconductor lighting (LED) industry development status, including domestic LED epitaxial materials and chips mainly in the middle and low; 80% of power LED chips and devices rely on imports; there are blind With the phenomenon of investment and low-level construction, some local governments have blindly reconstructed road lighting regardless of economic efficiency, excessively investing in landscape lighting, leading to unregulated industry competition, and so on.
Double Twisting Machine
Application:
The high speed machines mainly used for stranding copper wire, aluminum wire, Steel Wire, ACSR and wire rope. Accompanied with taping head, it can used for insulation cores and some control cable stranding process.
Component:
Central pay-off, cage host, taping device(optional), capstan, take-up and traverse device and electric control system.
Main Character:
1.The machine can work steadily with the whole holder, and the protect cover adopts high grade seamless steel tube, so the structure is also steady with lower noises.
2.The timing power can be manipulated easily to adjust the speed .The protect cover has the right and reverse direction circumrotate.
3. The main machine and the haul-off unit adopt shift gears case, so the working intensity is lower and the pitch is exact.
4. Equipped with automatic parking equipment -the safeguard, it means the machine will stop when the thread runs out or the door is open.
Double Twister Machine,Double Twisting Machine,Cable Stranding Machine,Double Twist Stranding Machine